University of Brighton

uniproj

GRH were employed to carryout the installation of new chilled water services for Brighton University.

 

univproj2
 

GRH were employed to carryout the installation of new chilled water services from a new roof mounted Dry air cooler & pump station distributing throughout the new building to test cells. We carried out new thermal insulation and flushing of the entire chilled water system adding Glycol on completion.
100% of the welding was measured and fabricated off site to completely remove the requirement for any on site hot works.


Main Contractor: Envirosound Ltd
GRH Solutions Limited Operatives: 5
GRH Solutions Limited Contract Value: £30,000.00

 

Key Points

  • New Dry Air Cooler installation

  •  New Chilled water pipe work

  •  New pipe insulation

  •  Flushing and dosing

  
All work was completed to schedule and an exceptional standard.