GRH was awarded the boiler replacement at the Blackshots sports centre as part of the primary system upgrades. We fabricated all new gas & LTHW pipe work off-site at our workshop to completely eliminate any on site hot works and to limit personnel on-site during the first COVID lockdown allowing other trades to attend and complete their works.
On completion all new services were tested, purged, flue and boiler condensate drains installed along with the floor painted.
Works were completed on programme.
To find out more about our services, or to get a quote, please get in touch.