LH-Plc employed GRH to carry out the strip out of all existing primary chilled water services to enable the replacement of an old chiller. Access & programme was tight on this project so all materials were craned to the roof and installed using 108mm brazed copper fittings to connect the new combined chiller / air source heat pump.

Part of our scope of works was to carry out control panel modifications and power supply upgrades.

On completion all new works were balanced, electrically tested and thermally insulated.

GRH Completed all works on schedule.

Services Provided

  • Chilled water.
  • Water balancing.
  • Pump replacements.
  • Power & controls.
  • Thermal insulation.

Project Details

  • Main Contractor: LH-Plc
  • GRH solutions Ltd Contact: LH-Plc
  • GRH Solutions Ltd operatives: 7
  • GRH Solutions Ltd Contract Value: £32,000.00