GRH were awarded the local 200mm chilled water pipe modifications following a twin chiller replacement at the Nestle site.

The first chiller lift also included a pipe freeze of the existing 200mm chilled water to allow a new spool to be install with a 100mm temporary chiller branch & new 200mm isolation valve.

All new 200mm spools were fabricated off-site removing the requirement to weld on site.

On completion all new pipe work was thermally insulated.

All works were completed on schedule.

Services Provided

  • Welding & fabrication.
  • Chilled water.
  • Thermal insulation.

Project Details

  • Main Contractor: LH-Plc
  • GRH solutions Ltd Contact: LH-Plc
  • GRH Solutions Ltd operatives: 5
  • GRH Solutions Ltd Contract Value: £18,000.00