GRH carried out the supply and installation of new 100mm chiller connections following the replacement of an existing chiller. These works included the supply and installation of new chiller support steels as the new chiller was longer and the design supply and installation of a new access platform for the chiller control panel.

All new pipe spools were welded off-site to remove the requirement for on-site hot works.

On completion all new services were insulated, and valve jackets applied.

GRH Completed all works on schedule.

Services Provided

  • Chilled water
  • Support Steels
  • Access platform
  • Thermal insulation

Project Details

  • Main Contractor: JSA
  • GRH solutions Ltd Contact: JSA
  • GRH Solutions Ltd operatives: 4
  • GRH Solutions Ltd Contract Value: £18,000.00