GRH was awarded the boiler replacement at an L&Q apartment block due to failings of the old boilers.

We had to fabricate as much of the new LTHW spools ready for a 3 day shutdown also carrying out the installation of new side stream filter and dosing pot ahead of the shutdown to push the programme on.

New secondary pumps were installed along with a new dirt and air separator, boiler shunt pumps and control and power alterations.

Services Provided

  • LTHW services
  • Boiler replacement
  • Natural gas

Project Details

  • Main Contractor: GRH
  • GRH solutions Ltd Contact: L&Q
  • GRH Solutions Ltd operatives: 8
  • GRH Solutions Ltd Contract Value: £148,000.00

Similar Case Studies