GRH was awarded the design & installation of a new low use out of hours chiller & chilled water circuit to be added to an existing 24hr chilled water circuit serving comms rooms.

Connections to the existing system was made to the existing 150mm secondary pumps via a PHE and control valves to change over the cooling source when out of normal hours working.

The new 80mm chilled water services were 100% welded off site to remove the need for on-site hot works.

All new servicers were balanced and thermally insulated on completion.

GRH Completed all works on schedule.

Services Provided

  • Chilled water
  • System design
  • Thermal insulation
  • Balancing

Project Details

  • Main Contractor: Unilever
  • GRH solutions Ltd Contact: LH-Plc
  • GRH Solutions Ltd operatives: 6
  • GRH Solutions Ltd Contract Value: £58,000.00