GRH was employed for the relocation of existing LTHW and boosted water services to the basement storage area of the flag ship Top Shop store in Oxford Street, London so the client could install a new access staircase.
All LTHW spools were fabricated off site to remove the need for on-site welding with the use of Victaulic fittings to connect to existing services during a weekend freeze of the services to allow installation of new valves.
Work was completed on programme.
To find out more about our services, or to get a quote, please get in touch.