GRH were awarded the local 125 & 100mm chilled water pipe modifications following a twin chiller replacement.

New 125 & 100mm spools were fabricated off-site leaving only a few loose flanges to be welded on-site. the GRH team were asked to attend site during the weekend chiller lift to help position the chillers to make sure the connections were located in the correct position for the new spools.

On completion all new pipe work was thermally insulated.

All works were completed on schedule.

Services Provided

  • Welding & fabrication.
  • Thermal insulation.

Project Details

  • Main Contractor: LH-Plc
  • GRH solutions Ltd Contact: LH-Plc
  • GRH Solutions Ltd operatives: 3
  • GRH Solutions Ltd Contract Value: £12,000.00